Open Requests for Proposals

for Vendors Doing Business with IMRF
Clouds

New Network Switches Fourth Floor

Written bids are required by IMRF for New Network Switches for the fourth floor as described in the general specifications. The bids should be submitted to IMRF on or before the close of business at 4:30 CST on January 31, 2019. Bids MUST include detailed fee schedule and cost projections.

Download the RFP